PRODUCTS CENTER
Iran ADW200-D16-4S CE Approved Digital Multi Circuits Energy Meter For IOT Platform Energy Consumption Monitoring
Category:
Product Description
Overview
ADW2XX series rail type multi-loop power meters are mainly used for measuring the full electric parameters of multiple three-phase circuits,Up to four three-phase loop current inputs can be connected simultaneously.It Can measure voltage and current, power, power factor, phase angle, unbalance, harmonic and other parameters.
Coding Rule

Dispaly


Function

1. Full electric parameter measurement of N(1,2,3,4) three-phase circuit, external Current transformer;
2. Monitoring 3 Phase Voltage/Current, Zero sequence Current, Frequency;
3. Monitoring 3 Phase power, total power (active, reactive, apparent);
4. Monitoring three Phase power-factor, total power-factor;
5. Monitoring Voltage/Current Phase Angle, Voltage/Current Degree of unbalance;
6. Monitoring Voltage, Current total Harmonic and 2-31 Fractional harmonics;
7. Record of voltage, current and power extremum of current month and last month;
8. Maximum Current, Maximum power demand and real time Current, real time power demand;


9. 200 event records, Record the action of DIDO;
10. Support over-voltage, over-current, phase failure, DI linkage and other alarm output;
11. 4 time zones 14 Periods rate setting;
12. Four quadrant electric energy,12-month multi rate electric energy;
13. 31 days four quadrant and multi rate electric energy freezing, Positive and negative energy metering;
14. 2 channel Switching inputs, 2 channel Switching outputs, RS485, Active pulse output(Switchable corresponding circuit).


Cable Temperature & Residual Current Measurement Module --- MTL
● Temperature Measurement: -20℃~+100℃
● Residual Current Measurement: 10~3000 mA
● Accuracy: Temperature:± 2℃; Residual Current: 1% (Class 1)
DO/DI Switch Extra Function Module --- MK
● 12 channel DI (Digital Input)
● 4 channel DO (Digital Output)


Expanded Communication Module --- AWT100
● 4G (Global general module)
● WiFi
● LoRaWAN
● LoRa
● NB-IoT
Network



Models
Specification model of ADW2xx series auxiliary transformer

Note: It is recommend that the distance between AKH-0.66/K-∅10N installation postion and the primary side transformer should be more than 1 meter
Dimension


Wiring
Wiring between ADW210 Main Body and MTL&MK Extra Function Module through RJ45 Interface
Wiring between 1 ADW210 Main Body and 1 AWT100 Communication Module
(Attention: In the connection between 1 ADW210 and 1 AWT100 through RJ45 interface,
we don't need Auxiliary Power Supply for AWT100)

Wiring between more than 1 ADW210 Main Bodies and 1 AWT100 Communication Module
(Attention: In the connection between more than 1 ADW210 and 1 AWT100 through RS485 Serial Ports,
we need DC24 or DC12V Auxiliary Power Supply for AWT100)
Installation

FAQ
Q: Could ADW2XX meters be used in IoT Energy Monitoring System for factory or building?
A: ADW2XX meters have standard RS485 interface and MODBUS-RTU communication protocol which allow it to be integrate with our IoT Energy Monitor Solution that can enable our users to remotely check all the data collect by energy meters like ADL3000(DTSD1352) on their mobile phone or PC. For more information, please Contact us or check in IoT Energy Monitoring Solution Introduction.
Q: What is Multi-rate/tariff function? How does it work?
A: First,multi-rate/tariff function was designed to be used for billing system. Second, the electricity price of different time duration in a day is different in some country.
Energy meter with this function can measure the kwh data and assign them to several time duration in a day and put a label of spike/peak/flat/valley kwh on them respectively. And if such energy meter was connected to the billing system by using a IoT gateway, it can send the kwh data of different time duration which was with the label of spike/peak/flat/valley kwh to the billing system for calculating the electricity bill of different time duration in a day.
For example, the electricity price of spike kwh is 5 USD/1 kwh, and time duration of from 9:00 am to 11:30 am was labeled as spike kwh.
Then, if energy meter record 3 kwh used in total during 9:00 am to 11:30 am, it will send the data of 3 kwh with the label of spike kwh to the billing system, and the system calculate the electricity cost of 3x5=15USD in total from 9:00 am to 11:30 am.
Other Question? Please contact us and we will get back to you as soon as possible.




