Solutions
Solutions

Design and application of power monitoring System in Jilin Fortune Square Project


Project name: Jilin Fortune Square Power Monitoring System

Project Location: Jilin

Project time: August 2022

 

Project Overview

Jilin Fortune Shopping Plaza is located at the intersection of JILIN Street and Shanghai Road, Changyi District, Jilin City, Jilin Province, adjacent to the East market of Jilin City, an important business district. The total scale is 300,000 square meters.

 

Scope of project

Jilin Fortune Shopping Plaza high voltage distribution room to collect 8 Ankerui AM5 microcomputers protection; 7 Ankerui AMC96-E4 microcomputer protection.

Read More

Design and application of electric energy management System in Xiamen Electric Nitrate Project


Project Name: Xiamen Electric Nitrate Project Power Management System

Project Location: Xiamen

Project time: June 2022

 

Project Overview

Xiamen Electric nitrate project, consisting of 2 10kV incoming lines and 8 transformer distribution rooms, provides energy for the fourth phase of the new construction.

 

Scope of project

In this project, Ankery provides a set of 3000WEB power management system, 2 ANet-2E4SM combined gateways and 270 APM520 power meters.

Read More

Design and application of enterprise microgrid energy efficiency management platform for technical transformation project of Luzhou Laojiao Intelligent Packaging Center


Project name: Enterprise Microgrid Energy efficiency Management Platform for technical transformation project of Luzhou Laojiao Intelligent Packaging Center

Location: Luzhou City, Sichuan Province

Project time: February, 2023

 

Project Overview

The technical renovation project of Luzhou Laojiao Intelligent Packaging Center covers a total area of 198,900 square meters, and a total construction area of 183,200 square meters.

 

Scope of project

Projects include: Power center center distribution center (ET1), packaging logistics center distribution center (ET2), packaging workshop distribution room 1 (ET3), packaging workshop distribution room 2 (ET4), finished product logistics center distribution room (ET5), distribution room (ET6), basement distribution room (ET7), Collect microcomputer protection, instrument, temperature controller, UPS, DC screen of these 7 distribution rooms.

Read More

EMS system design and application of Luzhou Zhonghai Grain and oil energy consumption monitoring System transformation project


Project name: EMS System of Luzhou CNOOC Grain and oil Energy consumption Monitoring System Transformation Project

Location: Luzhou City, Sichuan Province

Project time: January, 2023

 

Project Overview

EMS system can analyze the electricity, water, gas and other data inside the building, help users find and reduce the waste of energy use, thus reducing energy consumption and saving energy costs.

 

Scope of project

The project has 1 high voltage distribution room and 17 low voltage distribution rooms. Ancree provided the Acrel EMS enterprise microgrid energy efficiency management platform for the project, including: Acrel EMS software, Anet-1E1S gateway (17), and smart meter ADW300W(45).

Read More

The Design and Application of prepaid System for the renovation Project of Xinhua Shangzuo Shopping Center


Project Name: Renovation of Xinhua Shangzuo Shopping Center

Project Location: Zhengzhou

Project time: February 2022

 

Project Overview

Xinhua Shangzuan project, with a volume of 80,000 square meters, connects the commercial electricity of the shopping mall to the prepaid cloud platform, with a total of 7 layers. The electricity meters are installed in the distribution box in each layer, and the water meter communication line is drawn to the electric well nearby. All communication lines are collected in the negative layer through the electric well and connected to the collector. The collector collects and processes the data and transmits it to the cloud platform through the internal network.

 

Scope of project

There are 56 ADF400L series electric meters, 56 AMC96L electric meters and 93 water meters in the field equipment layer of the project. Four acquisition boxes are installed on the negative layer, and all communication lines of electricity and water meters are connected to the acquisition box on the negative layer.

Read More